The upgrade of Mt Kynoch Water Treatment Facility is a large, multi-year project to be completed in 2024.
Toowoomba Formwork were engaged to complete the full FRP package for the PAC Water Tank, Filter Tank and associated structures. The Water Tank included 7m high, 300mm thick walls.
The scope included formwork, reinforcement install, concrete pumping, concrete placement, scaffolding, blockwork & precast.